Pricing
Price the infrastructure layer around real rollout scope
Start with evaluation or pilot work, then expand multi-backend routing, OCPI roaming, and support only when the evidence is clear—not as a generic seat plan.
Choose scope for pilot, growth, or enterprise
Start with evaluation or pilot scope, then expand into multi-backend routing, roaming, and larger fleet control when the operating model proves out.
Billing period
- Up to 50 chargers
- OCPP 1.6 · 2.0.1 gateway
- Single hub connection
- Basic dashboard
GrowthPopular
For operators running live rollout, roaming, and multi-system operations
Everything in Starter +
- Up to 500 chargers
- OCPP 1.6 · 2.0.1 gateway
- Multi-hub routing (Hubject, Gireve)
- Parallel CPMS monitoring
- Real-time dashboard
- Flexible charger routing
- Automatic failover
- Priority support
Enterprise
For large estates, complex migration programs, and partner-heavy operations
Everything in Growth +
- Unlimited chargers
- All OCPP protocols
- Unlimited hub connections
- Multi-CPMS parallel sync
- Advanced failover routing
- Protocol translation (HTTPS/MQTT)
- Custom integrations
- Dedicated support & SLA
How to buy well
Commercial scope stays tied to infrastructure reality
Price the charger-facing layer, migration path, partner dependencies, and support model you need in production—not a generic SaaS seat count.
- Start with evaluation and pilot work before committing to fleet-wide backend change.
- Use ev-cloud alongside existing systems when direct replacement is too risky or too early.
- Tie commercial scope to routing complexity, roaming needs, and support ownership.
- Preserve data portability and migration leverage as platform requirements change.
Buyer toolkit
Evaluate cost with migration and lock-in in view
Pair pricing with scorecards and RFPs so procurement, product, and ops share one lens.
Guide
EV charging software pricing guide
Compare platform cost, rollout scope, support, and lock-in risk before procurement.
Guide
How to evaluate an OCPP platform
Structure vendor evaluation around migration path, integrations, and commercial fit.
Guide
OCPP gateway vs full CPMS replacement
Score coexistence, roaming readiness, and data ownership before demos.
What paid evaluation should prove
Pricing only works when rollout evidence is clear
Pilot before scale
Start with a bounded charger group and prove session integrity, routing behavior, and rollback before broader commercial commitment.
Parallel systems before replacement
Use the pricing conversation to decide how long current and target systems must coexist, not just which subscription tier looks cheaper on paper.
Operations before promises
Support ownership, roaming readiness, and data export matter more to long-term cost than a narrow feature-count comparison.
| Feature | |||
|---|---|---|---|
| Connectivity | |||
| OCPP 1.6 support | |||
| OCPP 2.0.1 support | |||
| Max chargers | 50 | 500 | Unlimited |
| Concurrent connections | 100 | 2,000 | Unlimited |
| Routing & Migration | |||
| Single backend routing | |||
| Multi-backend parallel routing | |||
| Automatic failover | |||
| Protocol translation (HTTPS/MQTT) | |||
| Live migration with rollback | |||
| Roaming & Interoperability | |||
| OCPI 2.1.1 | |||
| OCPI 2.2.1 | |||
| Hub connections | 1 | Multi (Hubject, Gireve) | Unlimited |
| Partner credential management | |||
| Operations & Monitoring | |||
| Real-time dashboard | Basic | ||
| Session & CDR export | |||
| Alerting & anomaly detection | |||
| Audit logging | |||
| Security & Compliance | |||
| TLS encryption | |||
| Role-based access control | |||
| SSO / SAML | |||
| Custom security review | |||
| Support | |||
| Community support | |||
| Priority email support | |||
| Dedicated support manager | |||
| SLA guarantee | |||
Frequently Asked Questions
Straight answers for teams evaluating an OCPP gateway, OCPI gateway, and AI-assisted ops layer—connectivity, roaming, coexistence, and migration risk.
Next step
Ready to map scope to your estate?
Bring charger volume, backends in play, and roaming pressure. We will recommend pilot shape and commercial next steps.